Hydro Power Plant Operation

 Hydro Power Plant Operation

Laxapana Complex

Laxapana Complex can be described as Kehelgamu – Maskeli Oya complex, as the five power
stations in the Laxapana Complex are situated along Kehelgamu oya and Maskeli Oya. The main
large reservoir at the top of Kehelgamu oya is Castlereagh reservoir, where the rain water from
the catchment area above the reservoir gets collected. Main reservoir associated with Maskeli
oya is Maussakelle reservoir.

Water collected in the Castlereagh reservoir is brought down along a power tunnel toWimalasurendra
power station to operate the two hydro turbine-generators, each 25 MW in capacity. Water released
from Wimalasurendra power plants after operation, gets collected in Norton pond, which is not a large
reservoir. This water is brought down along another tunnel to Old Laxapana power station to operate
five turbine-generator units, where 03 units are of 8.33 MW and other two units of 12.5 MW. Water
released after operations of Old Laxapana machines gets collected in Laxapana pond.

Similarly. Water collected in Maussakelle reservoir is taken along a tunnel to operate the two Canyon
machines of 30 MW each. Water discharged after operations gets collected in Canyon pond. This water
is brought down along another tunnel to operate the two New Laxapana machines which are 50 MW
each.These two machines release the water to Laxapana pond as Old Laxapana machines.

Water collected in Laxapana pond is taken along a tunnel to operate the two machines, which are
37.5 MW each, at Samanala power station at Polpitiya. Water released from Samanala machines flow
into the Kelani river,which forms by Kehelgamu oya and Maskeli oya.



 
Mahaweli Complex

The first reservoir in Mahaweli complex is the Kotmale reservoir. Water is taken to operate the three turbine –generator units (each of 67 MW) at Kotmale power station. Water released after operations flows along the
river into the Polgolla barrage, which is a small pond. From Polgolla barrage, water is diverted to North
Central province for irrigation and other purposes. This is done by carrying the water through a long tunnel to
Ukuwela power station to operate two 20 MW machines. Water released after operating these 02 units
flow to Bowatenna reservoir. Water is sent to Anuradhapura district direct from Bowatenna reservoir, and
water used to operate the 40 MW machine at Bowatenna power station is sent to Elahera anicut, again to
distribute for irrigation.

When water spills over the Polgolla barrage, during rainy seasons, it flows along the Mahaweli river to
the large Victoria reservoir. The three 70 MW hydro units at Victoria power station operates using water
from Victoria reservoir. Water released after operations at Victoria power station flows to Randenigala
reservoir, which is the largest reservoir in Mahaweli complex. Water at Randenigala reservoir is used to
operate the two 60 MW machines at Randenigala power station and then released to Rantambe reservoir.
Though said a reservoir, it is also a small pond which can be regulated. Water at Rantambe pond is taken
to operate the two machines at Rantambe power station, which are of 25 MW capacity each. The discharged
water from Rantambe power station is sent to Minipe anicut. This water is then distributed to right and left
banks of Minipe canals to use for downstream irrigation and other purposes.

The primary objective of the Mahaweli system is to provide water to irrigation and other usages. Power
generation is the secondary purpose. Ceylon Electricity Board and Water Management Secretariat of
Mahaweli Authority of Sri Lanka jointly decides the water utilisation of these reservoirs, in a manner
which both parties benefit, ultimately giving the maximum benefit to the country........

Owner By : CEB
we got from details :- http://www.ceb.lk/sub/knowledge/hydropower.html

Posted by ....>>  (electrical section 2011-2013) Technical college Hasalaka